SNX-F16-08

  • Seat Installation – Part 3

    Seat Installation – Part 3

    Riveted forward seat pan hinge half to spar tunnel. Marked and located upper seat back hinge half onto cross tie box and pilot drilled. Updrilled hinge, deburred, and riveted. Located rear seat pan centered to ribs and pilot drilled. Located seat support strap on seat attach angles and pilot drilled. Updrilled assembly then located and…

  • Forward Fuselage Part Prep – Part 2

    Forward Fuselage Part Prep – Part 2

    Created -08 clips per legacy plans out of Z01-03 stock. Up drilled -03 assembly then dimpled aft -05 tunnel angle. Countersunk -04 support channel, -12 spacer plates, and -14L/R and -15L/R angles. Refitted components together, installed MS24694 bolts for standard gear configuration, and riveted with CCC rivets. F16 complete! Hours Worked: 4.85