Cleaned, prepped, and masked tail surfaces in same manner as previous parts. Removed hinge pins from flaps and ailerons to use on other parts while painting.




Hours Worked: 2.15
Build Log for Sonex 0849B
Cleaned, prepped, and masked tail surfaces in same manner as previous parts. Removed hinge pins from flaps and ailerons to use on other parts while painting.




Hours Worked: 2.15
Leave a Reply