Placed 1.125″ Adel clamps around LH landing gear leg and marked approximate mounting hole position on gear leg fairing. Removed fairing and drilled mounting hole in fairing. Temporarily bolted fairing to landing gear leg to mark second mount hole location with Adel clamp. Removed fairing again to drill second mount hole and deburr holes. Installed LH gear fairing onto LH gear leg with Adel clamps and AN525 hardware. Routed brake line over clamp and removed fuel vent line for future replacement. Marked areas to trim for brake lines at bottom of fairing. Repeated process for RH side gear fairing.




Hours Worked: 1.15
Leave a Reply