Updrilled hinge halves on seat pan channel, disassembled, deburred then riveted into final position. Installed forward seat pan with hinge pins then pinned forward mount hinge onto assembly. Located forward hinge onto spar tunnel and pilot drilled then updrilled. Removed forward hinge from aircraft then deburred spar tunnel and hinge holes.



Hours Worked: 1.50
Leave a Reply