Prepared wings for paint in the same manner as the fuselage. At the same time, masked opening in wings and riveted wing skin doublers into place.





Hours Worked: 3.70
Build Log for Sonex 0849B
—
Prepared wings for paint in the same manner as the fuselage. At the same time, masked opening in wings and riveted wing skin doublers into place.





Hours Worked: 3.70
Leave a Reply