SNB-F08: Seat Installation

  • Seat Installation – Part 3

    Seat Installation – Part 3

    Riveted forward seat pan hinge half to spar tunnel. Marked and located upper seat back hinge half onto cross tie box and pilot drilled. Updrilled hinge, deburred, and riveted. Located rear seat pan centered to ribs and pilot drilled. Located seat support strap on seat attach angles and pilot drilled. Updrilled assembly then located and…

  • Seat Installation – Part 2

    Seat Installation – Part 2

    Updrilled hinge halves on seat pan channel, disassembled, deburred then riveted into final position. Installed forward seat pan with hinge pins then pinned forward mount hinge onto assembly. Located forward hinge onto spar tunnel and pilot drilled then updrilled. Removed forward hinge from aircraft then deburred spar tunnel and hinge holes. Hours Worked: 1.50

  • Seat Installation – Part 1

    Seat Installation – Part 1

    Created miscellaneous hinges and hinge pins from P3 piano hinge stock. Assembled and riveted -02 and -04 seat pan assemblies. Located and pilot drilled hinge half’s to forward seat pan channel. Hours Worked: 6.60