  • RH Main Spar Assembly – Part 5

    RH Main Spar Assembly – Part 5

    May 25, 2024

    |

    SNX-W08: Main Spar

    Prep and priming of RH Main Spar Components Hours Worked: 3.82

    More Details…

  • RH Main Spar Assembly – Part 4

    RH Main Spar Assembly – Part 4

    May 25, 2024

    |

    SNX-W08: Main Spar

    Continuation of RH spar parts prep Hours Worked: 2.18

    More Details…

  • RH Main Spar Assembly – Part 3

    RH Main Spar Assembly – Part 3

    May 24, 2024

    |

    SNX-W08: Main Spar

    Disassembled RH main spar stack and began prepping parts for primer (deburring and countersinking) Hours Worked: 4.49

    More Details…

  • RH Main Spar Assembly – Part 2

    RH Main Spar Assembly – Part 2

    May 21, 2024

    |

    SNX-W08: Main Spar

    More component assembly of RH spar. Laid out, up drilled, and clecoed upper/lower stiffeners, vertical stiffeners, root rib attach blocks, wing attach block, and tie down angle. Ready for complete disassembly and deburr/countersink Hours Worked: 5.28

    More Details…

  • RH Main Spar Assembly – Part 1

    RH Main Spar Assembly – Part 1

    May 17, 2024

    |

    SNX-W08: Main Spar

    Start of assembly of main spar (RH side). Discovered oblong holes on spar web marked right side and will need to replace. Used LH spar web on RH assembly. RH upper spar cap was already drilled but needed to drill…

    More Details…

  • Wing Conversion Work – Part 4

    Wing Conversion Work – Part 4

    May 16, 2024

    |

    SNX-WC01: Wing Conversion

    Manufacture of wing conversion parts Hours Worked: 4.36

    More Details…

  • Wing Conversion Work – Part 3

    Wing Conversion Work – Part 3

    May 15, 2024

    |

    SNX-WC01: Wing Conversion

    Manufacture of wing conversion parts Hours Worked: 1.75

    More Details…

  • Previous Wing Work Inspection – Part 4

    Previous Wing Work Inspection – Part 4

    May 15, 2024

    |

    SNX-W09: Spar Caps

    Verification of previous work and sanding of -02R after replacement Hours Worked: 0.24

    More Details…

  • Previous Wing Work Inspection – Part 3

    Previous Wing Work Inspection – Part 3

    May 15, 2024

    |

    SNX-W10: Spar Webs

    Verification of previous work and manufacture of -06 and -07 Hours Worked: 1.19

    More Details…

  • Main Spar Part Creation – Part 1

    Main Spar Part Creation – Part 1

    May 14, 2024

    |

    SNX-W11: Main Spar

    Creation of main spar parts Hours Worked: 5.20

    More Details…

  • Wing Conversion Work – Part 2

    Wing Conversion Work – Part 2

    May 11, 2024

    |

    SNX-WC03: Rear Spar Conversion

    Modification of rear spars for model B conversion Hours Worked: 2.45

    More Details…

  • Wing Conversion Work – Part 1

    Wing Conversion Work – Part 1

    May 11, 2024

    |

    SNX-W12: Rear Spar

    Installation of W13-05R/L Tip Rib Attach Angles and final prep for -WC03 Hours Worked: 1.30

    More Details…

←Previous Page
1 … 18 19 20 21 22 23
Next Page→

Categories

  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.