AN3-5A

  • Oil Cooler and Separator Installation

    Oil Cooler and Separator Installation

    Mounted oil cooler bracket onto bottom side of intake and secured bolts with Loctite 242. Temporarily mounted oil cooler to engine then marked areas of baffling to remove for block heater and oil drain. Installed AN fittings into top of oil cooler. Made oil cooler hoses and routed them from oil filter housing to oil…

  • Mixture Cable Install

    Mixture Cable Install

    Installed mixture cable into center panel section and routed cable through previously installed cable safe. Measured out approximate length and removed inner cable from jacket (making sure to carefully catch ball in cable mechanism). Trimmed outer jacket then upsized cable hole in AeroInjector to 1/4″. Installed AeroInjector back onto back side of motor and ran…

  • Firewall Forward Fuel System

    Firewall Forward Fuel System

    Began working on firewall-forward fuel system by bending solid fuel line for drain branch. Ran -6 fuel line behind upper part of engine mount then bent line to come forward of bottom part. Created a drain cock mount out of scrap aluminum angle and secured drain cock and mount to engine mount with Adel clamps.…

  • Circuit Breaker Mounting

    Circuit Breaker Mounting

    Bolted Ram mount base to RH panel cover using AN3 hardware. Cut copper bus bars to size and drilled circuit breaker holes at 0.8 inch spacing. Installed circuit breakers into RH panel cover then secured bus bar onto bottom terminals of circuit breakers with 6R4 screws. Used two separate bus bars for circuit breakers; one…

  • Mounting of FWF Electrics

    Mounting of FWF Electrics

    Began mounting FWF components on firewall by laying everything out in a logical order then marking and drilling mount holes. Installed nutplates for all fixtures to enable easy replacement in the future. Temporarily mounted starter solenoid and voltage regulator for now pending proper bolts and ring terminals for ground wires. Hours Worked: 2.87

  • Final Tail Installation – Part 3

    Final Tail Installation – Part 3

    Installed vertical stabilizer onto fuselage. Replaced AN3-6A bolts in tail with AN3-5A bolts for better fit and to ensure nut wasn’t bottoming out on bolts. Installed weather stripping on bottom edge of vertical stabilizer. Removed hinge pin from rudder installed during painting and reamed out hinge loops. Cut rudder hinge pin to size then installed…

  • Rear Spar Carry Through Assembly

    Rear Spar Carry Through Assembly

    Created F03-02, F03-05L/R, F03-08 and -04/-07 spacers from legacy plans using angle and channel stock on hand. Clecoed together -01 rear spar carry through assembly together then updrilled all holes. Disassembled part and prepped parts for final assembly. Assembled all parts with rivets and AN3 hardware. F03 complete! Hours Worked: 6.65

  • Aft Forward Fuselage Assembly – Part 3

    Aft Forward Fuselage Assembly – Part 3

    Used rivet stems and clamps to hold center seatbelt channels into place while locating and pilot drilling seat ribs and channels to forward floor. Clecoed -14L/R angles into place. Located idler assembly and pilot drilled to lower cross member and seat belt attach assembly. Updrilled all holes in fuselage floor then removed floor for better…

  • Forward Fuselage Assembly – Part 6

    Forward Fuselage Assembly – Part 6

    Clecoed lower floor/firewall stiffener and floor stiffener into place. Deburred upper firewall and riveted to fuselage box. Deburred forward fuselage floor and clecoed into place. Will wait until very end to rivet floor into place. F11 complete! Hours Worked: 1.42

  • Fuselage Box Assembly – Part 10

    Fuselage Box Assembly – Part 10

    Riveted upper cross tie #2 to vertical channels and upper cross tie box to vertical channels #1. Fit cross tie splice plates to upper splice plates via AN3 bolt holes and riveted plates to cross tie box. F21 complete! Hours Worked: 0.67

  • LH Main Spar Assembly – Part 6

    LH Main Spar Assembly – Part 6

    Bolts inserted into LH spar and torqued. LH Main spar complete! Spar test fit and final drilling of alignment holes and wing attach blocks will be separated into WC02 task Hours Worked: 3.00

  • RH Main Spar Assembly – Part 9

    RH Main Spar Assembly – Part 9

    Completion of the riveting and bolting of the RH spar. Rivets finished, blemishes primed, and all attach angles bolted and final torqued. Did not bolt spar blocks on and clecoed left in tip web. Hours Worked: 5.75