SNB-F08-18

  • Seat Installation – Part 3

    Seat Installation – Part 3

    Riveted forward seat pan hinge half to spar tunnel. Marked and located upper seat back hinge half onto cross tie box and pilot drilled. Updrilled hinge, deburred, and riveted. Located rear seat pan centered to ribs and pilot drilled. Located seat support strap on seat attach angles and pilot drilled. Updrilled assembly then located and…

  • Seat Installation – Part 1

    Seat Installation – Part 1

    Created miscellaneous hinges and hinge pins from P3 piano hinge stock. Assembled and riveted -02 and -04 seat pan assemblies. Located and pilot drilled hinge half’s to forward seat pan channel. Hours Worked: 6.60