Aft Fuselage Side Panel Assembly – Part 5

Began final assembly of side panels by deburring, scotchbriting and cleaning all F25 parts. Started by riveting rudder cable fairlead mount blocks to vertical channels #1 and #5. Riveted lower longerons to aft fuselage side skins along with vertical channels #2-#5. Left vertical channel #1 just clecoed for now. Left top row of rivets on vertical channels clecoed per plans. Located lower splice plate and installed AN525 hardware through side skin, lower splice plate, and lower longeron. Installed plastic bushings into vertical channels and rubber bushings in LH assembly. Laid out inspection covers and drilled holes for PK screws. Installed inspection covers. F25 complete!

Hours Worked: 6.00