Installed rubber baffle material onto oil cooler duct. Installed EGT and CHT sensors onto engine and completed FWF wiring harness routing (other than oil pan heater). Verified temp probe operation with SkyView system then secured wires and routing in engine compartment. Secured throttle and mixture cables to engine mount using Adel clamps and started mapping sensors and gauge layout on PFD.





Hours Worked: 4.95
Leave a Reply