Follow-up Storage Treatment #2
Performed long-term storage procedure IAW Jabiru Maintenance Manual. Removed plugs and lubricated cylinders with Phillips 20W50 Anti-Rust Oil. Reinstalled plugs but did not torque. Removed rocker covers and lubricated rocker chambers with same oil. Reinstalled rocker covers but did not torque. Pulled prop through 15 times.

Fuel Tank Prep – Part 2
Drilled hole in fuel tank for fuel vent “oops” fitting then deburred/cleaned. Temporarily installed fuel tank straps and fuel tank then marked location of fuel tank vent on glareshield with strap duplicator. Removed fuel tank and drilled slightly oversized clearance hole in glareshield. Rinsed tank thoroughly with water then installed temporary brass plugs in bottom…

Fuel Tank Prep – Part 1
Located main drain hole in fuel tank and drilled opening with spade bit. Deburred edges with file and sandpaper then used wire trick to install “oops” fitting. Drilled fuel sender hole two inches over with step bit and deburred hole. Installed fuel sender oops fitting into tank. Hours Worked: 0.97

Glareshield Installation – Part 5
Deburred glareshield parts then riveted firewall angles to firewall. Clecoed glareshield into place then riveted to upper forward longerons and firewall angles. Left out stiffener until gas tank installation. Hours Worked: 2.24

Glareshield Installation – Part 4
Removed panel, control sticks, forward fuselage floor, and glareshield in preparation for part prep Hours Worked: 1.24

Glareshield Installation – Part 3
Pilot then updrilled panel to corner plates. Removed panel and taped on proposed panel layout for mockup. Temporarily bolted control sticks into place to verify fitment of everything. Hours Worked: 1.25

Glareshield Installation – Part 2
Made temporary seat cushions out of old mattress pad. Realigned glareshield to longerons and upper firewall and pilot drilled glareshield to firewall angle. Located instrument panel 3/4″ back from edge of glareshield and pilot drilled glareshield to instrument panel angle. Updrilled all glareshield holes. Hours Worked: 4.20

Glareshield Installation – Part 1
Located and clecoed firewall angles to upper firewall. Located and pilot drilled cross tie fittings to wing attach angle and upper longerons. Riveted cross tie fittings to wing attach angles but left clecoes in upper longerons so that forward spar tunnel can be removed. Located glare shield onto fuselage and pilot drilled to upper longerons.…

Instrument Panel Prep
Marked and bent -05 and -09 angles. Located -05 instrument Panel angles to back of instrument Panel and drilled/clecoed. Will install final rivets and dimple once panel is cut out. Hours Worked: 1.88

Seat Installation – Part 3
Riveted forward seat pan hinge half to spar tunnel. Marked and located upper seat back hinge half onto cross tie box and pilot drilled. Updrilled hinge, deburred, and riveted. Located rear seat pan centered to ribs and pilot drilled. Located seat support strap on seat attach angles and pilot drilled. Updrilled assembly then located and…

Seat Installation – Part 2
Updrilled hinge halves on seat pan channel, disassembled, deburred then riveted into final position. Installed forward seat pan with hinge pins then pinned forward mount hinge onto assembly. Located forward hinge onto spar tunnel and pilot drilled then updrilled. Removed forward hinge from aircraft then deburred spar tunnel and hinge holes. Hours Worked: 1.50

Seat Installation – Part 1
Created miscellaneous hinges and hinge pins from P3 piano hinge stock. Assembled and riveted -02 and -04 seat pan assemblies. Located and pilot drilled hinge half’s to forward seat pan channel. Hours Worked: 6.60