• Panel Installation – Part 5

    Panel Installation – Part 5

    Located GPS175 tray brackets onto tray and marked hole locations. Drilled screw holes into side brackets then installed 8-32 nutplates. Attached brackets to tray and mocked up location on panel backer. Updrilled bracket attach holes then prepped brackets and panel…

    More Details…

  • Panel Installation – Part 4

    Panel Installation – Part 4

    Continued cutting out holes for instruments in panel backer. Test fit with components part-way through cutting. Began prepping GPS175 tray for installation by cutting out side brackets from .063 sheet. Bent brackets and drilled lighting holes. Cut out notch in…

    More Details…

  • Follow-up Storage Treatment #3

    Follow-up Storage Treatment #3

    |

    Performed long-term storage procedure IAW Jabiru Maintenance Manual. Removed plugs and lubricated cylinders with Phillips 20W50 Anti-Rust Oil. Reinstalled plugs but did not torque. Removed rocker covers and lubricated rocker chambers with same oil. Reinstalled rocker covers but did not…

    More Details…

  • Panel Installation – Part 2

    Panel Installation – Part 2

    Continued prepping panel flange by dimpling right side flange and installing nut plates. Installed flanges back onto glareshield and checked fitment with panel and panel covers. Removed panel and covers and marked hole and cutout locations on panel. Cut a…

    More Details…

  • Tail Installation – Part 2

    Tail Installation – Part 2

    Mocked up vertical stabilizer into place and noticed elevator horn was impacting vertical stabilizer skin and preventing full motion. Removed vertical stabilizer and trimmed skin at base. Continued to file elevator horn to ensure full 25 degrees of pitch up.…

    More Details…