
Root Rib Prep – Part 2
Disassembled RH forward and aft root ribs and angles, prepared holes and ribs, and riveted parts together. Assembly ready for installation on main spar Hours Worked: 0.85
Build Log for Sonex 0849B

Disassembled RH forward and aft root ribs and angles, prepared holes and ribs, and riveted parts together. Assembly ready for installation on main spar Hours Worked: 0.85

Removed pitot mount doubler plate from #5 rib and deburred/dimpled all holes. Doubler plate riveted to rib. Installed Dynon heated pitot controller to outboard side of #4 rib using K1000-06 nutplates (x4) and AN526-632R8 screws Hours Worked: 0.75

Took apart RH wing box down to spars. Deburred and cleaned both main and rear spar. Began assembling wing ribs starting from #12 and working inboard. Deburred all holes in both forward and aft ribs, scotchbrited scratches, and cleaned with…

With forward skin up drilled and clecoed into place, transferred pitot mount main hole and doubler plate rivet holes into forward skin. Also drilled 1/4″ pitot mount bracket holes in doubler and forward skin. Cut out 4″ diameter access hole…

Finished up drilling upper/lower aft and forward RH wing skins. Removed upper aft wing skin and forward wing skin to drill aileron bell crank attach angles into aft lower wing skin and began drilling wing tiedown attach bolt hole. Hole…

Began up drilling wing tip and forward skin to #30 Hours Worked: 1.17

Trimmed fiberglass tip rib per supplemental instructions and clecoed into place. Did not fasten to main spar support angle but riveted to rear angle. Little bit of a gap on upper part of leading edge to be fixed with fiberglass…

Cut landing light hole into leading edge and deburred opening. Installed upper retaining hardware into wing including flush rivets. Will wait to do the rest of the installation until wing is in final form to ensure tight fit of landing…

Creation of -02, -03, -04, and -05 angles from scrap and installation of RH root ribs in place Hours Worked: 3.05

Clecoed in place RH Root Doubler and drilled skins in preparation of root Rib installation Hours Worked: 1.18

Finished drilling upper and lower RH Aft skins to main spar and clecoed forward skin fully to wing. Cinched forward skin into place using rachet straps and blanketed 2×4. All RH skins in place and drilled to #40. Still need…

Drilled RH upper aft wing skin to main spar and clecoed leading edge in place. First glance at fit looks good Hours Worked: 1.09