Replaced temporary bolts in starter solenoid with proper length bolts. Added extra bit of wire to alternator wires with solder splices and finished wiring and mounting voltage regulator and capacitor (minus the reset button). Drilled LH and RH grommet holes through firewall and clecoed gromet covers into place; will rivet when wiring is completed. Made a mount for the ground block out of 0.032″ scrap sheet and riveted to LH upper longeron behind instrument panel. Attached ground block to mount plate then ran 12 AWG main ground wire from battery to GB24 ground block.





Hours Worked: 3.92
Leave a Reply