Transponder/ADS-B Harness Wiring

Removed RH side panel cover and finished wiring all circuit breakers and power feeds. Installed power outlet on RH side of panel. Left feed wires for autopilot and aux power panel for now. Installed pre-fabricated transponder and ADS-B harnesses and routed them on RH side of fuselage. Removed flip flop and squat switch wires from transponder wiring harness. Installed 1.21k resister between GPS175 serial line and transponder per SkyView instructions. Trimmed remaining unused main display wires and taped ends leaving enough room for future upgrades. Installed and routed 6′ SkyView network line between ADHRS unit and network hub on LH side floor of forward fuselage. Pulled aircraft outside and force loaded new components into SkyView network and verified transponder and ADS-B configurations.

Hours Worked: 4.72