Turtledeck Prep – Part 2
Laid out and marked location of F20-10 former clips on right side of F20-07 skin splice channel per legacy plans. Temporarily attached with clecoes pending final fit with formers and fuselage. Hours Worked: 0.25

Fuselage Box Assembly – Part 6
Flipped fuselage tail cone onto side and began up drilling fuselage floor to #30. Left forward lower corners of floor and #1 lower cross tie at pilot size to be completed when backordered fuselage conversion parts arrive. Up drilled AN525 holes in fuselage floor, longerons, and F23-03 forward lower mount angle per both plan sets.…

Finally, an Engine!
Inventory of a used Jabiru 3300 six cylinder, 120 horsepower engine purchased used from a private seller in Connecticut and shipped LTL. The engine was removed from a Legend Cub so the current owner could put a larger prop on the aircraft. The engine was removed this past summer and has a total of 171…

Turtledeck Prep – Part 1
Creation of -07 skin spar channel and -10, -11, and -12 clips from channel stock per legacy plans. Channel stock cut with snips and pilot holes drilled per plans Hours Worked: 2.50

Former Clip Creation
Creation of -07L/R former clips from F07 stock. 1/8″ radius bends made using 1/4″ drill bit in vice. Angles verified with full size plans Hours Worked: 0.95

Aft Fuselage Part Prep – Part 4
Used F26-05 crosstie plates to pilot drill four new holes in cross tie channel per B-Model plans. Hours Worked: 0.38

Splice Plate Prep
Located and pilot drilled new SNB-F26-04L/R upper splice plates to upper longerons based off of skin bend line. Located and final drilled cable fairlead blocks to #1 vertical channels. Verified alignment with rudder cable holes in vertical channels. Hours Worked: 0.45

Fuselage Box Assembly – Part 5
Completed pilot drilling and clecoing of aft fuselage floor to tail cone box. Attached crosstie box to cross tie splices and #1 vertical channels and clecoed bottom sheet into place. Fuselage still sits square with cross tie in place. Hours Worked: 1.40

Engine Hoist
Assembly of Harbor Freight engine hoist and small stool Hours Worked: 1.75

Fuselage Box Assembly – Part 4
Replaced F23-02 aft bulkhead and F23-03 forward lower mount angle with new parts and drilled 3/16″ holes for tailwheel mount. Located aft fuselage tail channel on rear of tail cone and pilot drilled and clecoed into place. Secured F23-04 aft lower mount angle against longerons and rear channel and drilled holes for AN3 hardware through…

Fuselage Conversion Kit Inventory – Part 2
Completion of inventory of Sonex fuselage conversion kit Hours Worked: 3.92

Fuselage Conversion Kit Inventory – Part 1
Partial inventory of Sonex fuselage conversion kit Hours Worked: 3.43