Everything Else
-
Black Interior Paint
—
Setup paint booth and moved fuselage/canopy parts into spray booth. Cleaned all parts with pre paint prep and discovered that not all parts would fit at the same time. Sprayed two coats of primer on black fuselage parts and windshield parts followed by three coats of rat rod matte black. Let parts dust dry for…
-
Black Paint Prep
—
Prepped fuselage and windshield/canopy parts for black paint. Masked off glareshield and cabin area with painters tape then taped drop cloth over tape lines. Scotchbrited miscellaneous canopy and windshield parts in preparation for paint. Hours Worked: 1.94
-
New Workbench and Shelf
Built a rolling shelving unit and new mobile workbench for the hangar in preparation of moving the fuselage to the hangar. Hours Worked: 5.15
-
Finally, an Engine!
Inventory of a used Jabiru 3300 six cylinder, 120 horsepower engine purchased used from a private seller in Connecticut and shipped LTL. The engine was removed from a Legend Cub so the current owner could put a larger prop on the aircraft. The engine was removed this past summer and has a total of 171…
-
Engine Hoist
Assembly of Harbor Freight engine hoist and small stool Hours Worked: 1.75
-
Fuselage Conversion Kit Inventory – Part 2
Completion of inventory of Sonex fuselage conversion kit Hours Worked: 3.92
-
Fuselage Conversion Kit Inventory – Part 1
Partial inventory of Sonex fuselage conversion kit Hours Worked: 3.43
-
Wing Storage Stand
Creation of wing stand from builders association plans Hours Worked: 2.42
-
Wing Leveling Stand
Creation of wing support stands. Rear spar pillar is 3″ high with 10 degree slope. Main spar pillar is 1.5″ high with 5 degree slope. Pads carpeted to protect skin Hours Worked: 0.83
-
Workbench Extension
Creation of workbench extender to add 4 feet to current workbench. Attaches via (2) 1/2″ bolts and is removable Hours Worked: 1.72
-
Wing Conversion Kit Inventory
Inventory of Sonex’s Wing Conversion Kit for legacy aircraft Hours Worked: 1.31
-
Hardware Reorganization
Reorganize hardware into new storage solution Hours Worked: 4.22