  • Forward Fuselage Part Prep – Part 1

    Forward Fuselage Part Prep – Part 1

    December 14, 2024

    |

    SNB-F16: Lower Skin

    Bent trailing edge of forward fuselage floor up 5 degrees. Pilot drilled holes in top edge of -02 forward tunnel zee. Began clecoing -03 aft tunnel web assembly together. Hours Worked: 1.16

    More Details…

  • Firewall Prep – Part 1

    Firewall Prep – Part 1

    December 13, 2024

    |

    SNB-F17: Firewall

    Creation of miscellaneous firewall components per plans. -10, -11, and -12 parts created via legacy plans set. Bent edges of -01 up per plans and set aside. -03 assembly created from firewall former halves.. Hours Worked: 2.27

    More Details…

  • Tail Cone Box Wrapup

    Tail Cone Box Wrapup

    December 10, 2024

    |

    SNB-F18: Tailcone

    Riveted turtledeck assembly to fuselage tail cone box per plans revision E. Up drilled holes through side skins and upper splice plates to 3/16″ and installed AN525 hardware. Torqued to spec. Clecoed crosstie closeout plate into place and riveted into…

    More Details…

  • Turtledeck Assembly – Part 8

    Turtledeck Assembly – Part 8

    December 6, 2024

    |

    SNX-F19: Turtledeck

    Riveted formers #5 through #2 to turtledeck skin starting at upper longerons and moving towards the skin splice channel. Riveted lower #1 formers to back of cross tie box then riveted upper #1 formers to turtledeck skin assembly. Riveted F20-08…

    More Details…

  • Turtledeck Assembly – Part 7

    Turtledeck Assembly – Part 7

    December 5, 2024

    |

    SNX-F19: Turtledeck

    Prepped and clecoed formers #4 through #2 to tail cone box and turtle deck skin. Prepped and clecoed #1 lower formers to cross tie box, side skins, and turtledeck skin. Prepped and clecoed upper #1 formers to turtledeck skin along…

    More Details…

  • Turtledeck Assembly – Part 6

    Turtledeck Assembly – Part 6

    December 3, 2024

    |

    SNX-F19: Turtledeck

    Deburred and prepped splice channel assembly and riveted skin splice channel and all attach angles. Deburred, scotchbrited, and acetoned LH and RH turtledeck skins and riveted to splice channel assembly to create -02 turtledeck skin assembly. Clecoed RH side of…

    More Details…

  • Flap Drive Tube Installation

    Flap Drive Tube Installation

    December 3, 2024

    |

    SNB-C05: Flap Actuator

    Located flap drive angles per plans and pilot drilled/clecoed into place. Marked center of lower crosstie #1 and flap drive tube and centered flap drive tube. Marked location of flap mount blocks and drilled 3/16″ holes in lower splice plates.…

    More Details…

  • Fuselage Box Assembly – Part 10

    Fuselage Box Assembly – Part 10

    November 24, 2024

    |

    SNX-F21: Tailcone

    Riveted upper cross tie #2 to vertical channels and upper cross tie box to vertical channels #1. Fit cross tie splice plates to upper splice plates via AN3 bolt holes and riveted plates to cross tie box. F21 complete! Hours…

    More Details…

  • Fuselage Box Assembly – Part 9

    Fuselage Box Assembly – Part 9

    November 19, 2024

    |

    SNX-F21: Tailcone

    Continued final assembly of tail cone. Started by clecoing lower cross ties and aft angle. Riveted aft angle and lower cross tie #5 in order to install aft Shear Web Assembly. Riveted shear web to aft bulkhead and lower aft…

    More Details…

  • Fuselage Box Assembly – Part 8

    Fuselage Box Assembly – Part 8

    November 16, 2024

    |

    SNX-F21: Tailcone

    Began reassembling aft fuselage assembly by clecoing upper and lower crossties to aft fuselage side panels. Hours Worked: 0.75

    More Details…

  • Aft Fuselage Part Prep – Part 5

    Aft Fuselage Part Prep – Part 5

    November 16, 2024

    |

    SNX-F24: Cross Ties

    Up drilled crosstie box cover and crosstie box. Also up drilled flap motor mount holes on bottom of crosstie box cover plate. Left flap drive mount holes on back of crosstie at 3/32″ as they will not be used. Hours…

    More Details…

  • Aft Fuselage Side Panel Assembly – Part 5

    Aft Fuselage Side Panel Assembly – Part 5

    November 16, 2024

    |

    SNX-F25: Aft Side Panels

    Began final assembly of side panels by deburring, scotchbriting and cleaning all F25 parts. Started by riveting rudder cable fairlead mount blocks to vertical channels #1 and #5. Riveted lower longerons to aft fuselage side skins along with vertical channels…

    More Details…

←Previous Page
1 … 13 14 15 16 17 … 31
Next Page→

Categories

  • Canopy and Windshield
  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.