Silger Sonex

Build Log for Sonex 0849B

  • Build Log
  • Tasks
  • Stats
  • About
  • Contact Me
  • Wing Rib Gussets

    Wing Rib Gussets

    June 23, 2024

    |

    SNX-W15: Forward Ribs

    Determined pre-existing -06 and -07 gussets were from outdated plans and needed to be scrapped. New -06 and -07 gussets cut, drilled, and bent from template using scrap .025 sheet. Finished trimming -01 and -02 forward ribs and clecoed to…

    More Details…

  • Wing Rib Spacers – Part 2

    Wing Rib Spacers – Part 2

    June 22, 2024

    |

    SNB-W14: Wing Ribs

    Mockup assembly of aft ribs, center spacers, and web spacers to spars and all pilot holes drilled through components. Creation of “skin simulators”. Need to check rib position yet. RH aileron bell crank assembly lubricated with white lithium. Hours Worked:…

    More Details…

  • Wing Rib Spacers – Part 1

    Wing Rib Spacers – Part 1

    June 21, 2024

    |

    SNB-W14: Wing Ribs

    Creation of -02 and -03 spacers from stock Hours Worked: 1.30

    More Details…

  • Wing Rib Prep – Part 4

    Wing Rib Prep – Part 4

    June 21, 2024

    |

    SNX-W16: Aft Ribs

    Finished up drilling and riveting gussets to aft ribs #1 – #4. W16 complete! Hours Worked: 1.70

    More Details…

  • Aileron Bellcranks – Part 5

    Aileron Bellcranks – Part 5

    June 20, 2024

    |

    SNX-W21: Aileron Bell Crank

    Used Loctite 638 retaining compound to hold Symmco bearings into place; worked very well. Assembled together angles to create pivot assembly then added -10 bell crank assembly and completed final riveting onto -01R to complete #9 rib assembly. Will let…

    More Details…

  • Wing Rib Prep – Part 3

    Wing Rib Prep – Part 3

    June 20, 2024

    |

    SNX-W16: Aft Ribs

    Began up drilling -01 through -04 ribs with gussets and finished riveting cut end of -01L Hours Worked: 1.05

    More Details…

  • Aileron Bellcranks – Part 4

    Aileron Bellcranks – Part 4

    June 20, 2024

    |

    SNX-W21: Aileron Bell Crank

    Drilling of holes in -13L/R and -14L/R vertical channels. Both -10 bell crank assemblies created. Two washers per assembly needed to get castle nut aligned properly. Completed -01L including final riveting and lubrication of pivot with white lithium grease. -08…

    More Details…

  • Aileron Bellcranks – Part 3

    Aileron Bellcranks – Part 3

    June 19, 2024

    |

    SNX-W21: Aileron Bell Crank

    Machined -06 and -07 angles from template and press fit Symmco bearings to create -02L assembly. (8) -09 clips cut from Z01-03 stock, drilled and completed, and -13/-14 channels cut (but not yet drilled). Hours Worked: 3.75

    More Details…

  • Aileron Bellcranks – Part 2

    Aileron Bellcranks – Part 2

    June 18, 2024

    |

    SNX-W21: Aileron Bell Crank

    Cut new blanks for -03 and -04 and cut out angles. Mated together angles and up drilled bolt hole through -05 spacer block. Symmco bushings are just a little loose in holes so will need to apply Loctite 638 before…

    More Details…

  • Aileron Bellcranks – Part 1

    Aileron Bellcranks – Part 1

    June 16, 2024

    |

    SNX-W21: Aileron Bell Crank

    Cut blanks and made templates for -03, -04, -06, and -07 angles. Made an error drilling holes for -03 and -04 angles and will need to scrap angles and create two more blanks Hours Worked: 2.67

    More Details…

  • Main Wing Spar Mating – Part 2

    Main Wing Spar Mating – Part 2

    June 15, 2024

    |

    SNX-WC02: Main Spar Conversion

    Inventory of Aircraft Spruce order and installation of the final rig plate bolt in the RH spar. W08 now complete Hours Worked: 0.74

    More Details…

  • Wing Rib Prep – Part 2

    Wing Rib Prep – Part 2

    June 14, 2024

    |

    SNX-W16: Aft Ribs

    Finished making -07 gussets and proceeded to prep aft wing ribs. All ribs prepped minus #9 aileron bell crank ribs. Test fit all ribs to spars and fit looks good; needed to do some slight trimming of -05 ribs to…

    More Details…

←Previous Page
1 … 16 17 18 19 20 … 23
Next Page→

Categories

  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.