  • Wing Rib Prep – Part 1

    Wing Rib Prep – Part 1

    June 13, 2024

    |

    SNX-W16: Aft Ribs

    Began preparation of the aft wing ribs. Traced template of -07 and -08 gusset and transferred to .025″ sheet to cut out. Bends formed via vice and small mallet. -08 gussets completed. Hours Worked: 3.27

    More Details…

  • Main Wing Spar Mating – Part 1

    Main Wing Spar Mating – Part 1

    June 13, 2024

    |

    SNX-WC02: Main Spar Conversion

    Mated spars together and up drilled alignment holes to 1/4″ per plans. Spars temporarily fastened together with AN4 hardware to drill wing attachment blocks. Holes drilled with drill press on ground and leveled by using 3/8″ bit and drill guide,…

    More Details…

  • LH Main Spar Assembly – Part 6

    LH Main Spar Assembly – Part 6

    June 13, 2024

    |

    SNX-W08: Main Spar

    Bolts inserted into LH spar and torqued. LH Main spar complete! Spar test fit and final drilling of alignment holes and wing attach blocks will be separated into WC02 task Hours Worked: 3.00

    More Details…

  • LH Main Spar Assembly – Part 5

    LH Main Spar Assembly – Part 5

    June 12, 2024

    |

    SNX-W08: Main Spar

    Finished up riveting LH main spar. Yet to complete bolts in wing attach blocks, lower stiffener, and outboard stiffener Hours Worked: 2.97

    More Details…

  • LH Main Spar Assembly – Part 4

    LH Main Spar Assembly – Part 4

    June 11, 2024

    |

    SNX-W08: Main Spar

    Final layup of LH main spar and start of riveting process. Riveted some flush rivets and bulk of mid-section of the spar. Only one oopsie. Hours Worked: 3.00

    More Details…

  • LH Main Spar Assembly – Part 3

    LH Main Spar Assembly – Part 3

    June 9, 2024

    |

    SNX-W08: Main Spar

    Finished LH main spar parts prep by deburring, finishing dimpling -02 web, and countersinking -03 center web and upper spar cap. All parts scowered and webs primed. Hours Worked: 5.70

    More Details…

  • LH Main Spar Assembly – Part 2

    LH Main Spar Assembly – Part 2

    June 8, 2024

    |

    SNX-W08: Main Spar

    Finished mockup of LH spar, disassembled and began prepping parts for priming and final assembly. Finished prepping machine parts and webs. Part-way through dimpling. still need to countersink -02 web Hours Worked: 4.89

    More Details…

  • LH Main Spar Assembly – Part 1

    LH Main Spar Assembly – Part 1

    June 1, 2024

    |

    SNX-W08: Main Spar

    Began prep of LH main spar. Up drilled new spar web to #21 while attached to spar caps using spar spacers and began mock up of all attachments. Still need to attach tip web, outside stiffener, and root rib angles…

    More Details…

  • RH Main Spar Assembly – Part 9

    RH Main Spar Assembly – Part 9

    May 30, 2024

    |

    SNX-W08: Main Spar

    Completion of the riveting and bolting of the RH spar. Rivets finished, blemishes primed, and all attach angles bolted and final torqued. Did not bolt spar blocks on and clecoed left in tip web. Hours Worked: 5.75

    More Details…

  • RH Main Spar Assembly – Part 8

    RH Main Spar Assembly – Part 8

    May 29, 2024

    |

    SNX-W08: Main Spar

    More RH main spar riveting. Drilled out 7 “oopses” Hours Worked: 2.50

    More Details…

  • RH Main Spar Assembly – Part 7

    RH Main Spar Assembly – Part 7

    May 28, 2024

    |

    SNX-W08: Main Spar

    Started riveting RH Main Spar. Alternated top and bottom rows and accomplished all rivets between top spar cap and upper stiffener angle. Overall probably 25% riveted Hours Worked: 2.00

    More Details…

  • RH Main Spar Assembly – Part 6

    RH Main Spar Assembly – Part 6

    May 26, 2024

    |

    SNX-W08: Main Spar

    Priming of small RH main wing spar parts and final mockup of RH main spar. Ready for riveting. Hours Worked: 2.07

    More Details…

←Previous Page
1 … 17 18 19 20 21 … 23
Next Page→

Categories

  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.