Silger Sonex

Build Log for Sonex 0849B

  • Build Log
  • Tasks
  • Stats
  • About
  • Contact Me
  • Tail Installation – Part 2

    Tail Installation – Part 2

    April 29, 2025

    |

    SNB-T01: Tail Installation

    Mocked up vertical stabilizer into place and noticed elevator horn was impacting vertical stabilizer skin and preventing full motion. Removed vertical stabilizer and trimmed skin at base. Continued to file elevator horn to ensure full 25 degrees of pitch up.…

    More Details…

  • Tail Installation – Part 1

    Tail Installation – Part 1

    April 25, 2025

    |

    SNB-T01: Tail Installation

    Began tail surface installation by moving tail surfaces from house to hangar. Discovered that horizontal stabilizer skins were installed upside down and that the bottom skins would need to be trimmed to fit around fuselage tail cone. Using the top…

    More Details…

  • Panel Redesign – Part 5

    Panel Redesign – Part 5

    April 16, 2025

    |

    Instrument Panel Design

    Exported panel files in Solid Works to DXF format to upload into Front Panel Designer. Imported files and began placing text on panels. Used Futura font and 10pt size in most places. Printed out front panel designs full scale and…

    More Details…

  • Control Pushrod Assemblies

    Control Pushrod Assemblies

    April 15, 2025

    |

    SNB-C03: Pushrods

    Cut aileron tube stock to size per plans for dual-stick configuration. Marked and drilled holes for pushrod end fittings, then deburred and riveted -01 main aileron pushrod assemblies. Pressed spoiler bearings into rod end bearings using vice then installed onto…

    More Details…

  • Rear Spar Carry Through Assembly

    Rear Spar Carry Through Assembly

    April 11, 2025

    |

    SNB-F03: Rear Spar Carry Through

    Created F03-02, F03-05L/R, F03-08 and -04/-07 spacers from legacy plans using angle and channel stock on hand. Clecoed together -01 rear spar carry through assembly together then updrilled all holes. Disassembled part and prepped parts for final assembly. Assembled all…

    More Details…

  • Fuel System Plumbing – Part 3

    Fuel System Plumbing – Part 3

    April 10, 2025

    |

    SNB-G01: Fuel System

    Installed 45 degree and AN fitting after fuel cube using Teflon paste. Cut a piece of solid aluminum fuel line to length and used tubing bender to bend into shape. Installed tube nut hardware on hardline and used flaring tool…

    More Details…

  • New Workbench and Shelf

    New Workbench and Shelf

    April 5, 2025

    |

    Workshop Prep

    Built a rolling shelving unit and new mobile workbench for the hangar in preparation of moving the fuselage to the hangar. Hours Worked: 5.15

    More Details…

  • Fuel System Plumbing – Part 2

    Fuel System Plumbing – Part 2

    April 3, 2025

    |

    SNB-G01: Fuel System

    Located new bulkhead hole one inch above plans measurement to ensure continuous fuel flow. Updrilled bulkhead hole to 9/16″. Created spacer from 1/8″ aluminum scrap to go between bulkhead tee fitting and nut to keep assembly from rotating. Tried to…

    More Details…

  • Panel Redesign – Part 4

    Panel Redesign – Part 4

    March 29, 2025

    |

    Instrument Panel Design

    Finished designing instrument panel assembly and creating drawings to print mockups prior to manufacturing Hours Worked: 1.86

    More Details…

  • Fuel System Plumbing – Part 1

    Fuel System Plumbing – Part 1

    March 28, 2025

    |

    SNB-G01: Fuel System

    Began plumbing the fuel system starting at the fuel tank. Used liquid teflon on all NPT threads. Made short run of fuel hose to go to bulkhead fitting. Had success creating fuel line by cutting line with cable snips and…

    More Details…

  • Panel Redesign – Part 3

    Panel Redesign – Part 3

    March 28, 2025

    |

    Instrument Panel Design

    Designed cutouts in stock panel blank to make panel cover removal easier. Began recreating assembly drawing with updated panel covers. Still need to model throttle and mixture controls along with circuit breakers Hours Worked: 2.89

    More Details…

  • Panel Redesign – Part 2

    Panel Redesign – Part 2

    March 27, 2025

    |

    Instrument Panel Design

    Started to redesign panel layout. Used most of old drawing but transferred and confirmed dimensions into new files. Split panel into three separate files to make import into Front Panel Designer easier. Opted to remove bottom features due to clearance…

    More Details…

←Previous Page
1 … 9 10 11 12 13 … 32
Next Page→

Categories

  • Canopy and Windshield
  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.