Silger Sonex

Build Log for Sonex 0849B

  • Build Log
  • Tasks
  • Stats
  • About
  • Contact Me
  • Main Landing Gear Installation – Part 4

    Main Landing Gear Installation – Part 4

    January 24, 2025

    |

    SNB-L01: Main Landing Gear

    Packed wheel bearings with Aeroshell 5 grease then installed tires onto axles. Tightened nuts then backed off until slight drag felt. Going to put off drilling cotter pin holes in axles until brake system is completed. Removed saw horses and…

    More Details…

  • Brake System Assembly – Part 1

    Brake System Assembly – Part 1

    January 24, 2025

    |

    SNB-L05: Hydraulic Brakes

    Prepped wheel pant mount plates by marking new holes and cut-outs. Drilled mount holes and used combination of files and rotary tool for brake line hardware cut outs. Riveted nutplates onto outside of plates for wheel pant hardware. Assembled brake…

    More Details…

  • Main Landing Gear Installation – Part 3

    Main Landing Gear Installation – Part 3

    January 24, 2025

    |

    SNB-L01: Main Landing Gear

    Drilled motor mount hole in new RH gear leg same as previous but used V block in drill press to ensure squareness. Deburred hole and attached new RH gear leg to fuselage with AN4-30A bolt. Drilled 1/8″ pilot hole through…

    More Details…

  • Main Wheel Assembly

    Main Wheel Assembly

    January 19, 2025

    |

    SNB-L01: Main Landing Gear

    Began prepping wheel assemblies by using large socket to fully set wheel bearing races into rim halves. Prepped tires and tubes by removing Schrader vale and applying talc to tire and tube. Assembled wheel assembly with new bolts from hydraulic…

    More Details…

  • Main Landing Gear Installation – Part 2

    Main Landing Gear Installation – Part 2

    January 18, 2025

    |

    SNB-L01: Main Landing Gear

    Leveled fuselage using wood blocks under tail. Clamped aluminum extrusion and spacers to axles and measured axle height from top of upper longerons. Began drilling RH axle. Realized part way through that toe in was not being measured from front…

    More Details…

  • Main Landing Gear Installation – Part 1

    Main Landing Gear Installation – Part 1

    January 17, 2025

    |

    SNB-L01: Main Landing Gear

    Started by setting up drill press to drill titanium legs. Opted to not trim gear legs and left the 1/8″ longer than plans. Drilled main gear legs using slowest speed on drill press and 1/8″ cobalt drill bit. After initial…

    More Details…

  • Engine Mount Installation

    Engine Mount Installation

    January 17, 2025

    |

    SNB-P10: Engine Mount and Installation

    Measured required bolt hole lengths which differed from plans. Used AN4-33A bolts for lower holes and AN4-32A bolts for upper holes. Inserted bolts into engine mount blocks then positioned mount on bolts. Torqued bolts to spec then applied torque seal.…

    More Details…

  • Aft Forward Fuselage Assembly – Part 4

    Aft Forward Fuselage Assembly – Part 4

    January 17, 2025

    |

    SNB-F09: Aft Lower Cabin

    Disassembled seat pans/channels to deburr and clean. Riveted seat pans and channels together then clecoed into fuselage. Riveted rear of assembly to aft seat belt channel and left clecoes in for center seatbelt channels and aft tunnel web spar per…

    More Details…

  • Aft Forward Fuselage Assembly – Part 3

    Aft Forward Fuselage Assembly – Part 3

    January 16, 2025

    |

    SNB-F09: Aft Lower Cabin

    Used rivet stems and clamps to hold center seatbelt channels into place while locating and pilot drilling seat ribs and channels to forward floor. Clecoed -14L/R angles into place. Located idler assembly and pilot drilled to lower cross member and…

    More Details…

  • Aft Forward Fuselage Assembly – Part 2

    Aft Forward Fuselage Assembly – Part 2

    January 11, 2025

    |

    SNB-F09: Aft Lower Cabin

    Pilot drilled and clecoed seat ribs and channels to fuselage floor. Clecoed together seat belt clips, attach channels, and seatbelt center channel and attached to inside seat pan ribs. Hours Worked: 0.82

    More Details…

  • Forward Fuselage Part Prep – Part 2

    Forward Fuselage Part Prep – Part 2

    January 11, 2025

    |

    SNB-F10: Aft Lower Cabin

    Assembled F10-16 idler assembly (skipping -21 and -17 sub assemblies. Used vice to press in Symmco bushings to pivot angles. Lubricated bushings and pivot bearings with LPS-2 prior to assembly. Hours Worked: 0.57

    More Details…

  • Follow-up Storage Treatment #1

    Follow-up Storage Treatment #1

    January 11, 2025

    |

    Engine Maintenance

    Performed long-term storage procedure IAW Jabiru Maintenance Manual. Removed plugs and lubricated cylinders with Phillips 20W50 Anti-Rust Oil. Reinstalled plugs but did not torque. Removed rocker covers and lubricated rocker chambers with same oil. Reinstalled rocker covers but did not…

    More Details…

←Previous Page
1 … 9 10 11 12 13 … 30
Next Page→

Categories

  • Canopy and Windshield
  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.