Silger Sonex

Build Log for Sonex 0849B

  • Build Log
  • Tasks
  • Stats
  • About
  • Contact Me
  • Aft Fuselage Side Panel Assembly – Part 2

    Aft Fuselage Side Panel Assembly – Part 2

    September 25, 2024

    |

    SNX-F25: Aft Side Panels

    Attached lower and upper longerons to RH aft side skin and pilot drilled all holes. Aligned and pilot drilled vertical channels #2 – #5 on both LH and RH aft side panels. Waiting on parts to pilot drill #1 vertical…

    More Details…

  • Aft Fuselage Side Panel Assembly – Part 1

    Aft Fuselage Side Panel Assembly – Part 1

    September 24, 2024

    |

    SNX-F25: Aft Side Panels

    Aligned upper longeron to LH aft side skin per plans and pilot drilled. Longeron set back 1/32″ from forward skin bend line and flush with top of skin. Lower longeron aligned along bottom edge of LH aft side skin using…

    More Details…

  • Aft Fuselage Side Panel Prep – Part 4

    Aft Fuselage Side Panel Prep – Part 4

    September 24, 2024

    |

    SNX-F26: Aft Side Panels

    Creation of -03R lower longeron from 1x1x0.125 (120) angle stock Hours Worked: 0.84

    More Details…

  • Fairlead Blocks

    Fairlead Blocks

    September 21, 2024

    |

    SNX-F27: Aft Side Panels

    Cut -09 fairlead mount blocks from 6″ x 12″ phenolic sheet with band saw. Drilled holes in mount blocks, counterbored rivet holes, and up drilled center hole for cable fairleads. Test fit fairleads. Will hold off on installing fairleads until…

    More Details…

  • Aft Fuselage Side Panel Prep – Part 3

    Aft Fuselage Side Panel Prep – Part 3

    September 20, 2024

    |

    SNX-F26: Aft Side Panels

    Creation of -02L/R and -03L Longerons. Cut stock with band saw and notched forward ends with rotary tool Hours Worked: 1.03

    More Details…

  • Aft Fuselage Side Panel Prep – Part 2

    Aft Fuselage Side Panel Prep – Part 2

    September 19, 2024

    |

    SNX-F26: Aft Side Panels

    Creation of -01L/R aft fuselage skins from F26-01 skin stock. Cuts followed SXB plans to account for flap drive holes. Simple hole cut in -01L and larger hole cut in -01R for flap drive tube. Rear access holes and rudder…

    More Details…

  • Aft Fuselage Side Panel Prep – Part 1

    Aft Fuselage Side Panel Prep – Part 1

    September 17, 2024

    |

    SNX-F27: Aft Side Panels

    Creation of vertical channels (other than -01L/R per conversion plans). Created templates for Detail A and B from .022 scrap stock to speed up process. Drilled 3/4″ hole in -02R vertical channel in the wrong location and will order replacement…

    More Details…

  • Flap Rebuild – Part 6

    Flap Rebuild – Part 6

    September 14, 2024

    |

    SNB-W05: Flaps

    After completion of the drive rib assemblies, reclecoed assemblies together and completed final riveting. Flaps installed onto wings and appear to fit well. Hours Worked: 1.87

    More Details…

  • Flap Rebuild – Part 5

    Flap Rebuild – Part 5

    September 14, 2024

    |

    SNB-W06: Flaps

    Up drilled drive plate attach holes to 1/4″ for AN4 hardware and clecoed AN366F-428A nutplates into place. Disassembled both drive plate ribs, deburred, and riveted assemblies together Hours Worked: 0.92

    More Details…

  • Flap Rebuild – Part 4

    Flap Rebuild – Part 4

    September 13, 2024

    |

    SNB-W05: Flaps

    Disassembled both LH and RH flap assemblies and deburred all parts. Cut out holes in -01L/R flap skin for flap tie rod clearance and reassembled flap assemblies with clecoes. Scotchbrited and acetoned all parts. Both assemblies ready for final riveting…

    More Details…

  • Flap Rebuild – Part 3

    Flap Rebuild – Part 3

    September 12, 2024

    |

    SNB-W05: Flaps

    Laid out flap rib holes on RH flap skin, center punched, and drilled. Bottom side skin cutout for flap pushrod marked. Lined up ribs under flap skin and began pilot drilling ribs starting with top side, upper hole on forward…

    More Details…

  • Flap Rebuild – Part 2

    Flap Rebuild – Part 2

    September 12, 2024

    |

    SNB-W06: Flaps

    Pilot drilled and up drilled -04 flap drive plates to -02 and -03 flap ribs. Countersunk flap drive plates for CCC-44 rivets. Deburred assemblies and clecoed together pending receipt of nut plates. Cut -06L/R hinge halves from -P3 piano hinge…

    More Details…

←Previous Page
1 … 9 10 11 12 13 … 23
Next Page→

Categories

  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.