Silger Sonex

Build Log for Sonex 0849B

  • Build Log
  • Tasks
  • Stats
  • About
  • Contact Me
  • Wing Conversion Work – Part 1

    Wing Conversion Work – Part 1

    May 11, 2024

    |

    SNX-W12: Rear Spar

    Installation of W13-05R/L Tip Rib Attach Angles and final prep for -WC03 Hours Worked: 1.30

    More Details…

  • Previous Wing Work Inspection – Part 2

    Previous Wing Work Inspection – Part 2

    May 10, 2024

    |

    SNX-W12: Rear Spar

    Inspection of rear Spar assemblies and removal of old W13-01R/L attach plates in preparation of new ones supplied with conversion kit. Hours Worked: 1.33

    More Details…

  • Previous Wing Work Inspection – Part 1

    Previous Wing Work Inspection – Part 1

    May 10, 2024

    |

    SNX-W13: Rear Spar

    Verification of previous work and prep for B-model conversion. Creation of -05L/R Hours Worked: 1.62

    More Details…

  • Wing Conversion Kit Inventory

    Wing Conversion Kit Inventory

    May 7, 2024

    |

    Inventory

    Inventory of Sonex’s Wing Conversion Kit for legacy aircraft Hours Worked: 1.31

    More Details…

  • Hardware Reorganization

    Hardware Reorganization

    May 3, 2024

    |

    Workshop Prep

    Reorganize hardware into new storage solution Hours Worked: 4.22

    More Details…

  • Vertical Stabilizer Tips – Part 2

    Vertical Stabilizer Tips – Part 2

    April 23, 2024

    |

    SNX-T02: Horizontal Tail Assembly

    Finished riveting left side tip rib, and tip doubler along with rough fiberglass work. Created right side tip doubler and did rough fiberglass work. T02 complete other than final hinge installation and cotter pin installation Hours Worked: 6.32

    More Details…

  • Elevator Trim Tab

    Elevator Trim Tab

    April 23, 2024

    |

    SNX-T07: Elevator

    Finished task by safety wiring trim tab hinge pin Hours Worked: 0.17

    More Details…

  • Vertical Stabilizer Tips – Part 1

    Vertical Stabilizer Tips – Part 1

    April 22, 2024

    |

    SNX-T02: Horizontal Tail Assembly

    Replacement of left vert stabilizer tip and fiberglass work Hours Worked: 3.00

    More Details…

  • Rudder Rebuild – Part 7

    Rudder Rebuild – Part 7

    April 21, 2024

    |

    SNX-T08: Vertical Tail

    Finish creation of vertical tip mounting flange and final riveting of vert stabilizer assembly. Hours Worked: 4.10

    More Details…

  • Rudder Rebuild – Part 6

    Rudder Rebuild – Part 6

    April 19, 2024

    |

    SNX-T08: Vertical Tail

    Finished riveting upper hinge half and began test fitting fiberglass tip and making extra flange for removable tip. Planning on getting tip rough fitted and fasteners made and then doing final fiberglass work later down the road Hours Worked: 6.00

    More Details…

  • Rudder Rebuild – Part 5

    Rudder Rebuild – Part 5

    April 18, 2024

    |

    SNX-T08: Vertical Tail

    Removed existing rudder hinge half from vertical stabilizer, remade, and clecoed into place. Final riveting and tine adjustment still needed Hours Worked: 2.68

    More Details…

  • Rudder Rebuild – Part 4

    Rudder Rebuild – Part 4

    April 16, 2024

    |

    SNX-T08: Vertical Tail

    Completed assembly of the rudder including final drilling and riveting. Discovered Hinge Half on vertical stabilizer is misaligned and will need to be replaced and refitted Hours Worked: 6.55

    More Details…

←Previous Page
1 … 28 29 30 31 32
Next Page→

Categories

  • Canopy and Windshield
  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.