
Wing Conversion Work – Part 2
Modification of rear spars for model B conversion Hours Worked: 2.45
Build Log for Sonex 0849B

Modification of rear spars for model B conversion Hours Worked: 2.45

Installation of W13-05R/L Tip Rib Attach Angles and final prep for -WC03 Hours Worked: 1.30

Inspection of rear Spar assemblies and removal of old W13-01R/L attach plates in preparation of new ones supplied with conversion kit. Hours Worked: 1.33

Verification of previous work and prep for B-model conversion. Creation of -05L/R Hours Worked: 1.62

Inventory of Sonex’s Wing Conversion Kit for legacy aircraft Hours Worked: 1.31

Reorganize hardware into new storage solution Hours Worked: 4.22

Finished riveting left side tip rib, and tip doubler along with rough fiberglass work. Created right side tip doubler and did rough fiberglass work. T02 complete other than final hinge installation and cotter pin installation Hours Worked: 6.32

Finished task by safety wiring trim tab hinge pin Hours Worked: 0.17

Replacement of left vert stabilizer tip and fiberglass work Hours Worked: 3.00

Finish creation of vertical tip mounting flange and final riveting of vert stabilizer assembly. Hours Worked: 4.10

Finished riveting upper hinge half and began test fitting fiberglass tip and making extra flange for removable tip. Planning on getting tip rough fitted and fasteners made and then doing final fiberglass work later down the road Hours Worked: 6.00

Removed existing rudder hinge half from vertical stabilizer, remade, and clecoed into place. Final riveting and tine adjustment still needed Hours Worked: 2.68