Tail Spar Reinforcement
Creation of doubler to account for edge violations in forward Spar. Decided that drilling out and replacing forward Spar would be too much work so created doubler to go on back side Hours Worked: 1.70
-
Rudder Rebuild – Part 1
Manufacture of replacement parts -04 and -06 Hours Worked: 1.18
-
Tail Inspection – Part 6
Inspection of previous work and removal of tip ribs for surface tip installation. Hole issues found in forward Spar and tip Rib. Will need to replace rib tip and create doubler for spar Hours Worked: 1.80
-
Tail Inspection – Part 5
Inspection of previous work Hours Worked: 0.28
-
Tail Inspection – Part 4
Inspection of previous work Hours Worked: 0.13
-
Tail Inspection – Part 3
Inspection of previous work Hours Worked: 0.10
-
Tail Inspection – Part 2
Inspection of previous work Hours Worked: 0.23
-
Tail Inspection – Part 1
Inspection of previous work. Hours Worked: 0.84
-
Tail Tip Mount
Removal of top rib to attach tip doubler and installation of T14-04 rib. Temp clecoed pending rudder installation Hours Worked: 2.47
-
Vertical Stabilizer Inspection – Part 5
Manufacture -03 and inspect existing work. Resulted in assemblies -01 and -02 Hours Worked: 0.94
-
Vertical Stabilizer Inspection – Part 4
Inspection of previously completed work Hours Worked: 0.50
-
Vertical Stabilizer Inspection – Part 3
Inventory of completed and installed vertical stabilizer parts. All previous work Hours Worked: 0.80