Tail Tip Mount
Removal of top rib to attach tip doubler and installation of T14-04 rib. Temp clecoed pending rudder installation
-
Vertical Stabilizer Inspection – Part 5
Manufacture -03 and inspect existing work. Resulted in assemblies -01 and -02
-
Vertical Stabilizer Inspection – Part 4
Inspection of previously completed work
-
Vertical Stabilizer Inspection – Part 3
Inventory of completed and installed vertical stabilizer parts. All previous work
-
Vertical Stabilizer Inspection – Part 2
Inspection of vertical stabilizer skin. Holes and fit look to be good. Slight damage notated on front right lower edge of stabilizer.
-
Vertical Stabilizer Inspection – Part 1
Inspect vertical stabilizer parts. Was able to see most of the parts externally but obviously not able to inspect internal components like clips. Work observed externally appears to be fine.
-
Rudder Issues
Removed rudder from vertical tail assembly to inventory parts and inspect via camera. Determined that rudder is twisted and will need to replace skin.
-
Initial Kit Inventory – Part 5
Finished inventory of last box of small parts