  • Panel Redesign – Part 1

    Panel Redesign – Part 1

    March 26, 2025

    |

    Instrument Panel Design

    After discovering issues with the panel cover, reached out to Sonex tech support and obtained original STL file. Printed out layout and compared to existing panel blank; much better fit. Converted STL into Solidworks file for panel redesign. Hours Worked:…

    More Details…

  • Rudder System Installation – Part 1

    Rudder System Installation – Part 1

    March 22, 2025

    |

    SNB-C01: Flight Controls

    Located rudder pivot blocks onto fuselage and temporarily inserted rudder pedals to check fit. Fit and function seemed good so clamped blocks to fuselage and drilled forward mounting holes. Will need to remove assembly to apply grease in future. Hours…

    More Details…

  • Rudder System Prep – Part 1

    Rudder System Prep – Part 1

    March 18, 2025

    |

    SNB-C02: Rudder System

    Cut rudder pedal pivot blocks from Phenolic sheet. Matched similar blocks together and rough sanded. Clamped blocks together then drilled mount holes with drill press. Temporarily bolted blocks together and sanded edges flat. Marked holes for rudder pedals then through…

    More Details…

  • Follow-up Storage Treatment #2

    Follow-up Storage Treatment #2

    March 16, 2025

    |

    Engine Maintenance

    Performed long-term storage procedure IAW Jabiru Maintenance Manual. Removed plugs and lubricated cylinders with Phillips 20W50 Anti-Rust Oil. Reinstalled plugs but did not torque. Removed rocker covers and lubricated rocker chambers with same oil. Reinstalled rocker covers but did not…

    More Details…

  • Fuel Tank Prep – Part 2

    Fuel Tank Prep – Part 2

    March 13, 2025

    |

    SNB-G01: Fuel System

    Drilled hole in fuel tank for fuel vent “oops” fitting then deburred/cleaned. Temporarily installed fuel tank straps and fuel tank then marked location of fuel tank vent on glareshield with strap duplicator. Removed fuel tank and drilled slightly oversized clearance…

    More Details…

  • Fuel Tank Prep – Part 1

    Fuel Tank Prep – Part 1

    March 12, 2025

    |

    SNB-G01: Fuel System

    Located main drain hole in fuel tank and drilled opening with spade bit. Deburred edges with file and sandpaper then used wire trick to install “oops” fitting. Drilled fuel sender hole two inches over with step bit and deburred hole.…

    More Details…

  • Glareshield Installation – Part 5

    Glareshield Installation – Part 5

    March 4, 2025

    |

    SNB-F06: Glareshield

    Deburred glareshield parts then riveted firewall angles to firewall. Clecoed glareshield into place then riveted to upper forward longerons and firewall angles. Left out stiffener until gas tank installation. Hours Worked: 2.24

    More Details…

  • Glareshield Installation – Part 4

    Glareshield Installation – Part 4

    February 11, 2025

    |

    SNB-F06: Glareshield

    Removed panel, control sticks, forward fuselage floor, and glareshield in preparation for part prep Hours Worked: 1.24

    More Details…

  • Glareshield Installation – Part 3

    Glareshield Installation – Part 3

    February 8, 2025

    |

    SNB-F06: Glareshield

    Pilot then updrilled panel to corner plates. Removed panel and taped on proposed panel layout for mockup. Temporarily bolted control sticks into place to verify fitment of everything. Hours Worked: 1.25

    More Details…

  • Glareshield Installation – Part 2

    Glareshield Installation – Part 2

    February 6, 2025

    |

    SNB-F06: Glareshield

    Made temporary seat cushions out of old mattress pad. Realigned glareshield to longerons and upper firewall and pilot drilled glareshield to firewall angle. Located instrument panel 3/4″ back from edge of glareshield and pilot drilled glareshield to instrument panel angle.…

    More Details…

  • Glareshield Installation – Part 1

    Glareshield Installation – Part 1

    February 5, 2025

    |

    SNB-F06: Glareshield

    Located and clecoed firewall angles to upper firewall. Located and pilot drilled cross tie fittings to wing attach angle and upper longerons. Riveted cross tie fittings to wing attach angles but left clecoes in upper longerons so that forward spar…

    More Details…

  • Instrument Panel Prep

    Instrument Panel Prep

    February 5, 2025

    |

    SNB-F07: Glareshield and Panel

    Marked and bent -05 and -09 angles. Located -05 instrument Panel angles to back of instrument Panel and drilled/clecoed. Will install final rivets and dimple once panel is cut out. Hours Worked: 1.88

    More Details…

←Previous Page
1 2 3 4 5 … 23
Next Page→

Categories

  • Controls
  • Electrical
  • Everything Else
  • Fuselage
  • Landing Gear
  • Powerplant
  • Tail
  • Wings

Silger Sonex

Build Log for Sonex 0849B

Get in touch with me

Warning: The information and documentation provided on this blog regarding the construction of an experimental aircraft are for reference and informational purposes only. The author assumes no liability for any injury, death, or damage resulting from the use of this information. Build and operate at your own risk.